Release bearing legs have been shortened by 12 mm to allow it to fit inside bellhousing. I made adapter plate from 10 mm thick aluminium to secure release bearing in place.
Valve cover has been machined so it can house the coils and I made mounting adapter myself from 6 mm aluminium so that is almost ready too.
Got a K&N cone filter. I originally intended to use OEM E36 M3 filter housing but it fouls with the planned radiator exhaust air funnel that will vent through hood so I will make custom filter box from aluminium.

Engine block and rods are ready, will pick them up later this month and rebuild will finally start!
I think I will have workshop on my attic for the winter! Obviously not a replacement for a garage but allows me to build the engine and prepare some small things during winter
