Productive day:
The engine finally came off of the stand and on to the hoist.
I got the 13lb 323 flywheel all mounted up. Breaker bar in the right hand and torque wrench in the left... took a bit of skill to get them to 90lb/ft each.

Got the tranny mounted up:

I didnt really take a lot of pictures during the two hour struggle to get the engine in with the transmission on. Pretty much everything under the hood is hooked up and ready to go. I have the full M3 harness covers to go on too.




