More progress today on the plenum, got a big hole saw and cut two 55mm holes in the base plate.
The little bit i left at the side of the holes is for a M8 bolt to thread in to the back of the plate of the plenum from the back.

Then joind them up with the slitting disc in the grinder.

the view with the plate cut out, the bolts on the inside will be bolted on first before the plenum bolts over the job lot and lock tighted in place, i might even use longer bolts and even up some nylocks on the bits that poke out.

Next clamped all the way round with mole grips ready to drill the holes and keep everything aligned

Holes drilled and a slight downward pointing bend welded on to the plenum, not that neat as when i weled the two joining halfs of the plenum togeather and must have slightly miss judged how big a half was as its ended up at just over 3".


All trimmed on the edge of the stainless and ally sheet, just need to make a gasket.

Bolted it on to the car which ment i could weld up a boost pipe for the IC to TB leg of the pipework just need to work out were i want to put the dump valve.

need to make up the plate that the TB will bolt to next, got a peice of 10mm stainless flat bar which i will be able to cut out and then grind/polish it to match it to the plenum and the TB as there very slightly different sizes probly 3" and 2 3/4" or maybe even less :cool: