I temporarily attached ITB's to my spare cylinder head so I could see what modifications are needed to make idle/vacuum and fuel rails.
S50B30 Idle/vacuum rail needs to be cut at 4 places and welded together in 2, also one pipe needs to be cut out and relocated. Material is 1-1,5 mm steel so welding with MIG/TIG is possible. After modification this rail connects directly to original mounting points on ITB's, neat.
M42B18 fuel rail fuel lines interfere with ITB's and they should be cut out and welded to different angles and even then there is need to manufacture attachments between rail and ITB mounting points. Not good.
S50B30 fuel rail needs to be cut at 2 places and welded on 1 to make it perfect fit. After that it should neatly connect to original mountings points on ITB's. Only question is, how sensible is it cut and weld up a thingie that has 3 bar fuel inside it

Seems liek I got buyer for my spare set of Shrick copy cams and my custom chip made for them so Megasquirt would be funded by that alone. Also, if I sell that custom chip, I really
need to get Mega up and running, otherwise car is pretty useless