I started work on the engine in the past week. I got it up on a stand at the beginning of the week, I stripped all the ancillaries and loom, then gave it a good degreasing.
The plan is to get the throttle bodies, coil on plug conversion, etc sorted before I rebuild it, so its all ready to be refit during the buildup.
So, today I started fitting the ITB's. I've used the first and third pairs because they have the mounting points for fuel and vacuum rails. After trying a test fit of the rails, it looks like I'll have to heavily modify the existing 4 or 6 cylinder rails, or fabricate something from scratch.
I I did shorten the throttle bar though. It seems there may also be a problem with the throttle postition sensor because it clashes with the head. For just now, I have removed it and its bracket.
As mentioned in other threads, only the bottom holes on the bodies match the head, so I'll have to do something about that. Not sure what yet though...
Sorry about the quality of the photos, I'll get some better ones!!

