1
Engine + Driveline / Re: Swapping M42 engines, need advice
« on: September 11, 2019, 08:54:52 PM »
I ended up pulling just the engines and leaving the transmissions in vehicle. I wanted to keep my trans, so would have had to pull them apart anyways. Also I was concerned if I could maneuver the engine+trans over the radiator core support and still clear the garage door above.
I used a load leveler and got three m12-1.75 100mm threaded rods to use as extended guide pins. These two things helped and we got them mated back up about 90 minutes first engine, 45 minutes 2nd engine.
I used a load leveler and got three m12-1.75 100mm threaded rods to use as extended guide pins. These two things helped and we got them mated back up about 90 minutes first engine, 45 minutes 2nd engine.














